We have designed a comprehensive range of nylon fittings to be used
only on NAUTA® tanks. Each type of fittings is composed of 3 parts
which ensure together with the rubber seal and the rubber coated fabric
a complete tightness. The necessary fitting for self-installation
at the most suitable location on the tank wall. Generally, vent fittings
are required on holding or gas tanks (not required on water), should
be positioned at the higher end of the tank, while draw fittings are
best located at the lower end. Under no condition should fittings
be installed on the bottom side of the tank. All fittings should be
installed on the bottom side of the tank. All fittings should be installed
in the top half of the tank and not closer than 4” to the edge
and not through a seam doubler.